Plan takeoff software for mac4/29/2023 ![]() ![]() Numbers of joints, light fixtures, studs. The length of pipes, wires, and cables required in a project The data required for estimating the cost include things likeĪrea of landscaping and the volume of material required for it There is a lot of data and meticulous planning involved in the takeoff process. This estimation is then used as the structure for the cost of the project as well as for bidding on projects. Takeoff, also known as material takeoff or quantity takeoff, is the process of estimating costs by calculating the quantity of material and other supplies required in construction project management before the project even begins. ![]()